THE JAMES BAY
The dams will also require 12
spillways, 6 control structures,
and 218 dikes. The dikes forming
the reservoir areas will have a
combined length of about 128
kilometres — double the length of
dikes built for the huge Churchill
The history of the generation and transmission of hydroelectric power
is a relatively short one, dating in Canada only from the last half of the
Nineteenth Centry.
In the hundred years that have passed, this source of energy has
undergone a tremendous development. In fact, whereas in 1900 total
installed hydro capacity in Canada was a mere 133,000 kilowatts , today
it is over 200 times as large, a fabulous expansion considering the fact
that population in the same period has increased only fourfold.
One of the greatest hurdles that
stood in the way of widespread
use of electricity was the problem
of transmitting power from the
often remote and inconvenient
power sites to urban areas. This
was partially solved in the first
decade of this century by the use
of high-tension transmission lines
permitting electric power to flow
over fairly long distances. How-
ever, the vast hydroelectric po-
tential of Northern Canada,
especially in Quebec, Labrador,
Manitoba, and British Columbia,
lay beyond the reach of high-ten-
sion transmission lines. This was
left undeveloped until the 1960’s
when a_ technological break-
through, the development. of
extra-high voltage (EHV) trans-
mission, dramatically extended
the distance over which electric
power could be transmitted econ-
onically. This breakthrough, there-
fore, made available the power of
the James Bay complex.
This development will cover an
immense area of 356 square kilo-
metres, more than one-fifth of
Quebec. Within the area, which
lies some 430 kilometres north of
Montreal, there are five large
rivers, the Nottaway, Broadback,
Rupert, Eastmain, andLa Grande,
and more than 100,000 lakes.
The hydroelectric development
of the area has been divided into
two regions and two phases; the
first phase will be the construc-
tion of the La Grande complex in
the northern part of the region,
while the second phase will be
centred in the south, harnessing
the Rupert, Broadback and Not-
taway Rivers, as well as the upper
reaches of the Eastmain.
This focal point of the develop-
ment sector represented a super-
ior choice for two main reasons:
50
Large additional quantities of wa-
ter, could be easily diverted into
the La Grande River basin from
the Caniapiscau, Great Whale
and Opinaca Rivers, increasing
the average annual flow of the La
Grande by 80%, and the topo-
graphy was such that a great deal
of power could be produced with
only a few generating stations.
Power available from La Grande
complex is expected to exceed 8
milion kilowatts, or in terms of
annual energy, 58 billion kilowatt
hours.
Four main dams and power-
houses will be built along the La
Grande River on four sites desig-
nated LG-1, LG-2, LG-3 and LG-4.
The powerhouses will be distrib-
uted along the river for a distance
of 480 kilometres from the coast,
using the entire vertical drop avail-
able between the highest eleva-
tion of 363 metres and sea level.
Falls development.
The LG-1 site will be situated
36.8 kilometres up river from Fort
George. The powerhouse will be
located in the river channel and
will have eight 115,000 kilowatt
units.
Atthe LG-2 site, 116 kilometres
from Fort George, there will be
sixteen 275,000 kilowatt units
using avertical drop of .42 metres
and with an installed capacity of
4,400,000 kilowatts.
The power installation at LG-3,
located on an island 236 kilo-
metres from the river
metres from the river’s mouth, will
have a capacity of 1,500,000 kilo-
watts, and its five 300,000 kilo-
watt units will utilize a vertical
drop of 79.5 meters.
Finally, LG-4 will be built 460
kilometres from Fort George, and,
similar to LG-2, this powerhouse
will be located underground. Four
375,000 kilowatt units, utilizing a
TEN YEARS Teer.
Va
reat
a
ies
Pa
EI
Ee
ae
en
ae
Pee!
a7
At
4
ad
aa
ada
el
an
| | | oO eee
eeu ie | | a
ca
Peaks ros
Cas
pe"
cia |e
pS
Go | S|
1967 1968 1969
1979 1971
(Q7Z 1975 1974 1975 1976
<RU BE Te PHY Re
PROJECT
vertical drop of 120 metres will
bring its installed capacity to
1,500,000 kilowatts.
The LG-2 powerhouse is ex-
pected to be in operation by
1980, delivering partial power of
490,000 _ kilowatts, while the
entire installed power and electri-
city produced by the La Grande
complex, 8.3 million kilowatts in
all, will be available for—use_in
Quebec by 1985.This will boost
/ Quebec’s position as the leading
province in the production of
electrical energy in Canada. Cur-
rently, Quebec produces about
one-third of Canada’s total elec-
tricity and is rapidly becoming
one of the world’s leading pro-
ducers. It now stands second
\ only to Norway in the amount of
tricity produced per capita.
While Canada hasbeen en-
dowed with large energy re-
sources, the demand for energy
has been increasing at the brisk
pace of 6.7% per annum. In
Quebec, the rate of increase has
been slightly higher with demand
doubling about every nine years.
It is estimated, in fact, that total
Capacity required in Quebec may
illion kilowatts in 1985.
/ As these projections indicate,
_ James Bay power production will
. supply a very significant part of
~Quebe’s future power needs.
James Ba
VANCOUVER-SUN 10/3/77
OTTAWA (CP) — The James Bay land
claims agreement, the first major, modern
treaty with Canadian native people, be-
came law today. ;
Bills making the historic agreement final
were proclaimed simultaneously by the
federal and Quebec governments.
The agreement gives roughly 6,500 Cree
and 4,200 Eskimos living in Quebec’s north-
ern territory $255 million over 20 years,
ownership of small parcels of land for their
communities, plus exclusive hunting, fish-
ing and trapping rights over large tracks of
land
In return, they surrendered their aborigi-
nal rights to the 379,000-square-mile territo-
There had been problems about selection
of Eskimo lands, but Indian Affairs Minis-
ter Hugh Faulkner said today these were
resolved last week. :
The Eskimos also have complained that
y land pact signed
DISTANCES
from
MONTREAL
IN KILOMETRES
K00>-9 7600 Km
TRA
rT
Quebec’s language charter violates the
agreement and last month asked Ottawa to
withhold proclamation of its bill.
Faulkner, however, said in the news re-
lease that there is no conflict between the
language charter and the James Bay
agreement.
A clause in that bill says the agreement
takes precedence over any other provincial
law applicable to the territory. The federal
bill contains a similar clause.
The Eskimos sought exemptions from
sections of the language charter requiring
children whose parents were not educated
in English in Quebec to attend French
schools.
They also have demanded exemptions
from sections of the language law that
would require them to introduce French
into native-controtled businesses. Both
exemptions were denied.
James Bay
Winnipeg
St. John’s
Goose Bay
Hudson Strait
Jacksonville,
Florida
BOREAL INSTITUTB Gi5:6.5 24
LIBRARY,
KM FROM
MONTREAL
230
165
480
800
890
830
1800
1650
1275
1600
1575
51
ALL ABOUT
Energy and transportation were the major attractions to the aluminum
pioneers of the St. Lawrence Valley at the turn of the century. They started
what has become a $2.5 billion industry, employing nearly 50,000
people coast-to-coast, and a key component of the Canadian economy.
Canada is the western world’s third largest aluminum producer, after
the U.S.A. and Japan, and, in most years, has been the world’s leading
exporter of ingot. From its birth in 1901, the. Canadian aluminum industry
has produced more than 24 million tons of ingot, worth over $10 billion.
Water tumbling from high plateaus
and mountains, or sweeping
down the St. Lawerence, turns
turbines and generators to pro-
duce the large quantities of
power needed for smelting al-
* uminum. Inland waterways, and
deep coastal ports, allow ships
up to 30,000 tons or more to land
raw materials -- mainly bauxite --
from the Caribbean, Latin Amer-
ica, Africa, and from Newfound-
land. The same ships leave with
holds full of ingot for world
markets. Aluminum for the U.S.A.
goes mainly by rail.
Seventy-six years ago, Can-
ada’s first aluminum smelter was
completed at Shawinigan, Que-
bec, on the St. Maurice River,
upstream from the pulp and paper
town of Trois-Rivieres. Slowly
over the years, aluminum produc-
tion grew until by 1950, Canada
became known as the “purveyor
of aluminum”. Since then, other
countries have entered the mar-
ket, but Canada’s wealth in re-
newable hydro energy ensures
its place as a major aluminum
producer.
From its beginning at Shawini-
gan, the aluminum industry grew
Extruding
Extruded Shapes
Or!
to include the Arvida facility on
the Saguenay River. Taking ad-
vantage of the roaring waters be-
low Lac St, Jean, the Saguenay
operation started in 1926 and be-
came the world’s largest smelting
complex. It retains that distinc-
tion now with 560,000 short tons
annual capacity ‘in ingot. The al-
uminum industry In Canada con-
sists of Alcan Aluminum Ltd. as
the main ingot producer and fab-
rication, with its/plants spanning
the nation ae smelters in the
Saguenay, a hewn , Beau-
as near Vente ae itimat,
) The other company \is the
Cae Reynolds Metals group
with four Companies.
Together these companies
have more than $2.5 billion in-
vested In harnessing hydro power;
organizing the flow of materials,
in smelters, fabricating and al-
umina plants, in technology and
manpower. Alcan employs about
20,000 people, and the Reynolds
group 3,300. Alcan, Canadian-
based, is the most international of
the | worlds’s aluminum com-
panies. Half its total investment is
in Canada, and it has bauxite,
alumina, smelting and fabricating
FABRICATING PROCESSES
=a
interests in the U.S.A., Europe,
Scandinavia, India, Japan, Latin
America, Autralasia and Africa.
The flows of materials are organ-
ized on a broad _ international
scale, much like a major world oil
company.
The Canadian Reynolds Metals
group consists of four separate
companies. Canadian Reynolds
Metals Co. Ltd., owned 100 per
cent by Reynolds Metals of the
U.S.A., operates the 175,000
tons yearly capacity smelter at
Baie-Comeau, about 800 kilo-
metres northeast of Montreal, on
the St. Lawrence north shore.
About 60 percent of its ingot is
moved to other Reynolds plants
in Canada, and the rest goes to
Reynold’s American finishing
operations and other markets.
Reynolds Aluminum Co. of
Canada Ltd. is the main fabricat-
ing company with a large plant at
Cap-de-la-Madeleine, near Trois
Rivieres, Quebec, and is minority-
owned by Canadians. The
Reynolds group also operates a
rod, wire and cable plant at La
Malbaie, 100 kilometres east of
Quebec City; has other fabricat-
ing operations in Montreal and
Toronto; and extrusion plants at
Ste. Therese, Quebec, and Rich-
mond Hill, near Toronto. The Rey-
nolds Canadian sales network
covers most major cities coast-
to-coast, and the group sells semi-
finished products to Canada’s
large number of independent fab-
Casting
7
Aluminum is easy to fabricate. It can be rolled,
pressed, drawn, impact extruded, forged, cast formed,
welded, riveted, brazed, glued, sheared, sawn, etc. Its
surface can be patterned, and anodized to give it a
tough, natural or coloured finish.
MAP OF THE WEEK
SPL Ways
EGi)-21-5'm
L.G2-142m
L.G.3 - 79.5 m
L.G.4-120m
VERTICAL DROPS
CAMAPISCAU RIVER
BASIN
LA GRANDE RIVIERE
BASING
SALE IN KILOMETERS
><
Lu
ad
a.
=
O
O
co
Lu
=
O
oO.
o
LL}
-
<
>
Lu
Q
<=
<
o
LO)
<
and
Lud
as
=
. Printed in Canada by
Service Printing
LETTERS
Will there be articles on political
leaders? We find it difficult in a rural area
to have materials on elections and leaders
which can be used in class.
The forthcoming issues on population
will be very welcome! Also, Canadian
foreign policy is difficult to teach due to
lack of basis materials on Nato, Norad,
U.N. and Commonwealth. We _ look
forward to your magazine.
Pearl Gregor
New Sarepta
High School,
New Sarepta, Alberta
Thank you for the prompt delivery of
the back issue of your first edition.
I was particularly interested in your
article on the dig at Namu. Here at Simon
Fraser we have a particular interest in
educating students about the topic of
archaeology. Our first interest is, of
course, to sensitize students to the need
for the conservation and correct excava-
tion of archaeological sites. The archaeol-
ogy department has an active school
programme for just this reason.
Your article on Namu was interesting
but incorrect in places. Parts of the
diagram of the stratigraphy are com-
pletely reversed. I fear that your artist did
not have a clue about the hafting or
appearance of microblades.
If you decide to do more articles on
archaeology please feel encouraged to do
so. However, I should like to offer either
my services or those of the appropriate
faculty member to preview articles on
archaeology before publication. We will
happily provide this service at no cost to
your publication.
Thank you for your interest.
Editha Stephens, Ph.D.
Curator of Education
Museum of
Archaeology and
Ethnology
Simon Fraser
University
We apologize for the errors and accept your
previewing offer with gratitude.
The Editors
CANADA NOW! is published by Canada Now! Publishers Ltd., P.O. Box 91386, West Vancouver, B.C. V7V 3P1
Phone (604) 926-2864
Publisher and Editor: Colin H. Campbell
Comptroller: R.W. Thacker, C.A.
Writers: Angus Gunn, Faculty of Education, U.B.C.; David Breen, Dept. of History, U.B.C.
Translator: Jean-Claude Arluison
Circulation: Laurie Bissett
Art Director: Richard Sandoval
Printed in Vancouver by Service Printing. Canada Now! is not responsible for loss or damage of unsolicited manuscripts
or photographs. Second Class Mail Registration No. 4106.
INTRODUCTORY SUBSCRIPTION RATES: $18 for 36 issues; class sets of 10 or more - $15 each.
SUBSCRIPTION ORDERS PLACED AFTER DECEMBER 31, 1977 — $18 for 18 issues
BACK ISSUES $2 ea.
CANADA NOW!
Subscriber:
P.O. Box 91386, West Vancouver, B.C. V7V 3PI1
SUBSCRIPTION ORDER FORM
Dept:
Street:
Province:
City:
Purchaser:
Street:
City:
P.O. No.:
Province:
Quantity:
Sub(s)
Commencing:
INTRODUCTORY SUBSCRIPTION RATES: $18 for 36 issues; class sets of 10 or more - $15 each.
Postal Code:
Postal Code:
@$18ea. $
Authorization
63
a) eee
os
University of Alberta Library